{"id":4066,"date":"2023-03-14T17:03:48","date_gmt":"2023-03-14T15:03:48","guid":{"rendered":"https:\/\/www.sipsa.net\/what-is-risk-based-software-testing\/"},"modified":"2024-05-06T11:12:40","modified_gmt":"2024-05-06T09:12:40","slug":"risk-based-testing","status":"publish","type":"post","link":"https:\/\/www.sipsa.net\/en\/risk-based-testing\/","title":{"rendered":"What is risk-based testing?"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start\" style=\"max-width:1144px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:0px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><p><span class=\"TextRun SCXW256042637 BCX9\" lang=\"EN-IE\" xml:lang=\"EN-IE\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW256042637 BCX9\">The <strong>risk-based testing<\/strong> (<strong>RBT<\/strong>) approach follows the principles of risk management, but in a testing context. <\/span><span class=\"NormalTextRun SCXW256042637 BCX9\">Let&#8217;s<\/span><span class=\"NormalTextRun SCXW256042637 BCX9\"> make <\/span><span class=\"NormalTextRun SCXW256042637 BCX9\">a short introduction<\/span><span class=\"NormalTextRun SCXW256042637 BCX9\"> of risk management and then go into risk-based software testing.<\/span><\/span><span class=\"EOP SCXW256042637 BCX9\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h2 style=\"text-align: center;\">Risk Management<\/h2>\n<p><span class=\"TextRun SCXW203566254 BCX9\" lang=\"EN-IE\" xml:lang=\"EN-IE\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW203566254 BCX9\">Risk management is the <strong>identification<\/strong>, <strong>assessment<\/strong>, <strong>mitigation<\/strong>, <strong>monitoring<\/strong> and <strong>reporting<\/strong> of potential <strong>threats<\/strong> and <strong>vulnerabilities<\/strong> <strong>to the proper performance of an organisation<\/strong>. Risk management is particularly <strong>important in quality management, which aims at optimising a product, service and\/or company.<\/strong><\/span><\/span><strong><span class=\"EOP SCXW203566254 BCX9\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/strong><\/p>\n<p><span class=\"TextRun SCXW201234607 BCX9\" lang=\"EN-IE\" xml:lang=\"EN-IE\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW201234607 BCX9\">Risk management is a continuous process, as new risks can appear at any time, so companies usually <\/span><span class=\"NormalTextRun SCXW201234607 BCX9\">establish<\/span><span class=\"NormalTextRun SCXW201234607 BCX9\"> regular meetings to carry out risk management. Risk analysis is a great tool with which to prevent and reduce failures, shorten processes, reduce costs, become more efficient and <\/span><span class=\"NormalTextRun SCXW201234607 BCX9\">ultimately improve<\/span><span class=\"NormalTextRun SCXW201234607 BCX9\"> the quality of the product, service and\/or company.<\/span><\/span><span class=\"EOP SCXW201234607 BCX9\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h3 style=\"text-align: center;\"><strong><span class=\"TextRun SCXW4134534 BCX9\" lang=\"EN-IE\" xml:lang=\"EN-IE\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW4134534 BCX9\">Stages of the risk management process<\/span><\/span><\/strong><\/h3>\n<p><strong>1.Risk identification\u00a0<\/strong><\/p>\n<p><span data-contrast=\"auto\">In this stage, a list of all the problems that are encountered and may arise is drawn up. In order to identify them correctly during this stage, the head or manager in charge of quality meets with the heads of the different areas and also takes into account the opinion of the clients. Risks can be operational, technical or business risks.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><strong>2.Risk impact analysis\u00a0<\/strong><\/p>\n<p><span data-contrast=\"auto\">Risks are quantified and prioritised. The probability of occurrence of that risk and also the impact it would cause is determined by assigning values: high &#8211; low &#8211; medium. Depending on the values given, risks with high probability and high impact will be addressed first.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><img decoding=\"async\" class=\"wp-image-4070 size-fusion-400 alignleft\" src=\"https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/matriz-riesgo_en-400x380.png\" alt=\"Risk matrix\" width=\"400\" height=\"380\" srcset=\"https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/matriz-riesgo_en-200x190.png 200w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/matriz-riesgo_en-300x285.png 300w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/matriz-riesgo_en-400x380.png 400w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/matriz-riesgo_en-600x570.png 600w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/matriz-riesgo_en-768x729.png 768w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/matriz-riesgo_en-800x760.png 800w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/matriz-riesgo_en-1024x972.png 1024w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/matriz-riesgo_en-1200x1140.png 1200w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/matriz-riesgo_en-1536x1459.png 1536w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/matriz-riesgo_en.png 1629w\" sizes=\"(max-width: 400px) 100vw, 400px\" \/><\/p>\n<p><span data-contrast=\"auto\">The <\/span><b><span data-contrast=\"auto\">probability<\/span><\/b><span data-contrast=\"auto\"> of occurrence of the risk may be due to different reasons:<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Poor understanding of the function by the product development team.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Inadequate architecture and design.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Insufficient time for design.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Incompetence of the team.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Inadequate resources: people, tools and technology.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">The <\/span><b><span data-contrast=\"auto\">impact<\/span><\/b><span data-contrast=\"auto\"> of the risk, and therefore the loss it produces, can affect:<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Impact on costs, with consequent losses.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Impact on business, with consequent loss of business or market share, legal proceedings or loss of licence.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Quality impact, resulting in an inferior or incompetent product.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Poor user experience, resulting in dissatisfaction and loss of customers.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><strong>3.Risk mitigation\u00a0<\/strong><\/p>\n<p><span data-contrast=\"auto\">The solution is sought and implemented. This stage involves both the quality department and the department where the risk is located. The quality manager proposes a solution and the relevant department confirms whether this proposal is feasible, as it may vary from one project to another, from one person to another, and from one company to another.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><strong>4.Follow-up\u00a0<\/strong><\/p>\n<p><span data-contrast=\"auto\">Once the solution has been implemented, it is constantly monitored to see if it has been implemented correctly or if new errors have arisen. This monitoring can be done by the quality team, the department concerned, or both.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><strong>5.Reporting<\/strong><\/p>\n<p><span data-contrast=\"auto\">Finally, a report is drawn up on the performance of the implemented solution, whether the risk has been solved or whether new risks have arisen. If the correct solution has not been found or the result is not as expected, we go back to the beginning.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h2 style=\"text-align: center;\">Risk-based testing o RBT<\/h2>\n<p><img decoding=\"async\" class=\"wp-image-4072 size-medium alignright\" src=\"https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/project-management_en-300x254.png\" alt=\"Project Management\" width=\"300\" height=\"254\" srcset=\"https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/project-management_en-200x169.png 200w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/project-management_en-300x254.png 300w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/project-management_en-400x338.png 400w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/project-management_en-600x507.png 600w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/project-management_en-768x649.png 768w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/project-management_en-800x676.png 800w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/project-management_en-1024x866.png 1024w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/project-management_en-1200x1014.png 1200w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/project-management_en-1536x1298.png 1536w, https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/project-management_en.png 1603w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><span data-contrast=\"auto\">In software development projects, there are common objectives, including: quality, project scope, cost control and meeting delivery or release deadlines. These objectives can be affected by unforeseen risks that increase, for example, project costs, scope changes, etc. and negatively affect the expected quality of the software.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">This is where this approach becomes important, when deviations occur that affect these objectives.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">With risk-based testing, the aim is to reduce the level of risk, as it is identified in advance and makes it possible to implement solutions or mitigation measures from very early stages of the project. Testing also serves to understand, discover, and provide valuable information that can help create better products.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h3><\/h3>\n<h3><strong><span class=\"TextRun SCXW159397418 BCX9\" lang=\"EN-IE\" xml:lang=\"EN-IE\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW159397418 BCX9\">Risk-based testing offers<\/span><\/span><span class=\"TextRun SCXW159397418 BCX9\" lang=\"EN-IE\" xml:lang=\"EN-IE\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW159397418 BCX9\">:<\/span><\/span><span class=\"EOP SCXW159397418 BCX9\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/strong><\/h3>\n<ul>\n<li><span data-contrast=\"auto\"><strong>Higher customer focus<\/strong>: RBT will help to further test what customers are most concerned about, highlighting what is most important to the company.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Reduced likelihood and impact of negative risks<\/strong>: by focusing testing on the highest negative risks, the likelihood of overlooking major defects decreases and therefore the probability assigned to the risk decreases as does its corresponding risk level. Moreover, as testing also provides feedback to the team, including its developers, the impact of a given risk can also decrease, as the feature being worked on can be done differently or better.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Increased confidence<\/strong>: RBT can help find the most important defects first, by focusing testing on the highest risks (or risk areas\/features), ensuring that important elements are tested thoroughly and found earlier; in this way, the product and its most important elements (e.g., features) can be launched with a high degree of confidence, while ensuring that they meet the intended quality objectives.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Optimising QA effort and costs<\/strong>: RBT can answer questions such as: What should we test, where should we start, when can we stop testing, can we reduce testing effort in any way, how and at what &#8220;cost&#8221;, if we have more time for testing, how can we best use it, and if we have more time for testing, what is the best way to use it? RBT allows defining the scope of testing, focusing on what is relevant and identifying which tests should be executed and their execution priority, considering time and resource constraints; the total number of test cases can be reduced. RBT allows (risk-based) choice of regression tests and provides some clues for selecting automated tests.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Increase the risk level of positive risks<\/strong>: if an opportunity is identified, RBT can be used for extensive testing and exploit it. Using testing as a constructive feedback loop, knowing the opportunities and their relative relevance, can increase the likelihood, impact and overall risk level of opportunities.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\"><strong>Make better decisions based on risk<\/strong>: sometimes it may be necessary to ship the product earlier, due to time or budget constraints: RBT can give you visibility of the risks, to make a decision knowing the risk. RBT can be used to overcome risks that block &#8220;acceptance&#8221; (i.e. customer acceptance of the release). RBT implicitly explains why some tests have been run instead of others, which facilitates communication with other stakeholders and avoids discussions about why some RBT tests have not been run at different levels.<\/span><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>The benefits of this approach are therefore:\u00a0\u00a0<\/strong><\/p>\n<ul>\n<li><span data-contrast=\"auto\">More efficient and optimised use of testing and QA resources. By allocating key resources towards high-risk areas.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Facilitates QA work, testing, test design and development, and test preparation activities by prioritisation.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Allows the QA team to test high-risk areas first and for the product to &#8216;fail fast&#8217; and be corrected quickly.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Provide clarity on &#8216;test coverage&#8217; and &#8216;test scope&#8217; to all stakeholders.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Allows the team to decide well in advance on the most effective form of product risk mitigation to be implemented.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Allows the team to take appropriate action, either to mitigate or to contingency plan or implement the solution to overcome the failure or reduce its impact.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Minimises residual risk in software delivery.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Helps improve customer experience and customer satisfaction.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<h3><span data-contrast=\"auto\">CONCLUSION<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/h3>\n<p><span data-contrast=\"auto\">Risk-based testing is an effective tool for the QA team to guide project stakeholders based on project risks, assisting in the continuous identification of risks and their resolution, and helps achieve the group&#8217;s goal of total quality in the final product.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">If you want to know more about <a href=\"https:\/\/www.sipsa.net\/en\/quality_digital_transformation\/\">quality<\/a>, <a href=\"https:\/\/www.sipsa.net\/en\/levels-of-software-testing\/\">testing<\/a>, software development, project management, technology strategy? <a href=\"https:\/\/www.sipsa.net\/en\/\">visit our blog<\/a>!<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":4037,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0},"categories":[539],"tags":[422,96,416,419,421,425,203,247,204,109,36,426],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What is risk-based testing?<\/title>\n<meta name=\"description\" content=\"Risk-based testing is an effective tool to continuously identify risks and their resolution, optimise the work of the testing team and help to achieve the ultimate goal of total quality of the final product.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.sipsa.net\/en\/risk-based-testing\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What is risk-based testing?\" \/>\n<meta property=\"og:description\" content=\"Risk-based testing is an effective tool to continuously identify risks and their resolution, optimise the work of the testing team and help to achieve the ultimate goal of total quality of the final product.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.sipsa.net\/en\/risk-based-testing\/\" \/>\n<meta property=\"og:site_name\" content=\"SIPSA Servicios de Inform\u00e1tica Profesional\" \/>\n<meta property=\"article:published_time\" content=\"2023-03-14T15:03:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-05-06T09:12:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/risks.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SIPSA Servicios de Inform\u00e1tica Profesional\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@SIPSA_IT\" \/>\n<meta name=\"twitter:site\" content=\"@SIPSA_IT\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SIPSA Servicios de Inform\u00e1tica Profesional\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.sipsa.net\/en\/risk-based-testing\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.sipsa.net\/en\/risk-based-testing\/\"},\"author\":{\"name\":\"SIPSA Servicios de Inform\u00e1tica Profesional\",\"@id\":\"https:\/\/www.sipsa.net\/#\/schema\/person\/a15cd2234040add6c317cd853ed05d3b\"},\"headline\":\"What is risk-based testing?\",\"datePublished\":\"2023-03-14T15:03:48+00:00\",\"dateModified\":\"2024-05-06T09:12:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.sipsa.net\/en\/risk-based-testing\/\"},\"wordCount\":1380,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.sipsa.net\/#organization\"},\"keywords\":[\"management\",\"Quality\",\"risk based testing\",\"risk management\",\"risks\",\"software project management\",\"Software Quality\",\"software testing\",\"Spherical Quality\",\"test automation\",\"testing\",\"tests\"],\"articleSection\":[\"Software Testing\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.sipsa.net\/en\/risk-based-testing\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.sipsa.net\/en\/risk-based-testing\/\",\"url\":\"https:\/\/www.sipsa.net\/en\/risk-based-testing\/\",\"name\":\"What is risk-based testing?\",\"isPartOf\":{\"@id\":\"https:\/\/www.sipsa.net\/#website\"},\"datePublished\":\"2023-03-14T15:03:48+00:00\",\"dateModified\":\"2024-05-06T09:12:40+00:00\",\"description\":\"Risk-based testing is an effective tool to continuously identify risks and their resolution, optimise the work of the testing team and help to achieve the ultimate goal of total quality of the final product.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.sipsa.net\/en\/risk-based-testing\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.sipsa.net\/en\/risk-based-testing\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.sipsa.net\/en\/risk-based-testing\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/www.sipsa.net\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What is risk-based testing?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.sipsa.net\/#website\",\"url\":\"https:\/\/www.sipsa.net\/\",\"name\":\"SIPSA Servicios de Inform\u00e1tica Profesional\",\"description\":\"Calidad Software en la Transformaci\u00f3n Digital\",\"publisher\":{\"@id\":\"https:\/\/www.sipsa.net\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.sipsa.net\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.sipsa.net\/#organization\",\"name\":\"SIPSA\",\"url\":\"https:\/\/www.sipsa.net\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sipsa.net\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.sipsa.net\/wp-content\/uploads\/2018\/08\/Logo-SIPSA-Horizontal-POSITIVO.jpg\",\"contentUrl\":\"https:\/\/www.sipsa.net\/wp-content\/uploads\/2018\/08\/Logo-SIPSA-Horizontal-POSITIVO.jpg\",\"width\":800,\"height\":250,\"caption\":\"SIPSA\"},\"image\":{\"@id\":\"https:\/\/www.sipsa.net\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/twitter.com\/SIPSA_IT\",\"https:\/\/www.linkedin.com\/company\/17918127\/\",\"https:\/\/www.youtube.com\/channel\/UC58Ur4nhjXpHMwK0RwaawCA?view_as=subscriber\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.sipsa.net\/#\/schema\/person\/a15cd2234040add6c317cd853ed05d3b\",\"name\":\"SIPSA Servicios de Inform\u00e1tica Profesional\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.sipsa.net\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.sipsa.net\/wp-content\/uploads\/2021\/02\/Logo-SIPSA-POSITIVO300ppp.jpg\",\"contentUrl\":\"https:\/\/www.sipsa.net\/wp-content\/uploads\/2021\/02\/Logo-SIPSA-POSITIVO300ppp.jpg\",\"caption\":\"SIPSA Servicios de Inform\u00e1tica Profesional\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/17918127\/\",\"https:\/\/twitter.com\/SIPSA_IT\",\"https:\/\/www.youtube.com\/channel\/UC58Ur4nhjXpHMwK0RwaawCA?view_as=subscriber\"],\"url\":\"https:\/\/www.sipsa.net\/en\/author\/sipsa\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What is risk-based testing?","description":"Risk-based testing is an effective tool to continuously identify risks and their resolution, optimise the work of the testing team and help to achieve the ultimate goal of total quality of the final product.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.sipsa.net\/en\/risk-based-testing\/","og_locale":"en_US","og_type":"article","og_title":"What is risk-based testing?","og_description":"Risk-based testing is an effective tool to continuously identify risks and their resolution, optimise the work of the testing team and help to achieve the ultimate goal of total quality of the final product.","og_url":"https:\/\/www.sipsa.net\/en\/risk-based-testing\/","og_site_name":"SIPSA Servicios de Inform\u00e1tica Profesional","article_published_time":"2023-03-14T15:03:48+00:00","article_modified_time":"2024-05-06T09:12:40+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/www.sipsa.net\/wp-content\/uploads\/2023\/03\/risks.png","type":"image\/png"}],"author":"SIPSA Servicios de Inform\u00e1tica Profesional","twitter_card":"summary_large_image","twitter_creator":"@SIPSA_IT","twitter_site":"@SIPSA_IT","twitter_misc":{"Written by":"SIPSA Servicios de Inform\u00e1tica Profesional","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.sipsa.net\/en\/risk-based-testing\/#article","isPartOf":{"@id":"https:\/\/www.sipsa.net\/en\/risk-based-testing\/"},"author":{"name":"SIPSA Servicios de Inform\u00e1tica Profesional","@id":"https:\/\/www.sipsa.net\/#\/schema\/person\/a15cd2234040add6c317cd853ed05d3b"},"headline":"What is risk-based testing?","datePublished":"2023-03-14T15:03:48+00:00","dateModified":"2024-05-06T09:12:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.sipsa.net\/en\/risk-based-testing\/"},"wordCount":1380,"commentCount":0,"publisher":{"@id":"https:\/\/www.sipsa.net\/#organization"},"keywords":["management","Quality","risk based testing","risk management","risks","software project management","Software Quality","software testing","Spherical Quality","test automation","testing","tests"],"articleSection":["Software Testing"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.sipsa.net\/en\/risk-based-testing\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.sipsa.net\/en\/risk-based-testing\/","url":"https:\/\/www.sipsa.net\/en\/risk-based-testing\/","name":"What is risk-based testing?","isPartOf":{"@id":"https:\/\/www.sipsa.net\/#website"},"datePublished":"2023-03-14T15:03:48+00:00","dateModified":"2024-05-06T09:12:40+00:00","description":"Risk-based testing is an effective tool to continuously identify risks and their resolution, optimise the work of the testing team and help to achieve the ultimate goal of total quality of the final product.","breadcrumb":{"@id":"https:\/\/www.sipsa.net\/en\/risk-based-testing\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.sipsa.net\/en\/risk-based-testing\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.sipsa.net\/en\/risk-based-testing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.sipsa.net\/en\/"},{"@type":"ListItem","position":2,"name":"What is risk-based testing?"}]},{"@type":"WebSite","@id":"https:\/\/www.sipsa.net\/#website","url":"https:\/\/www.sipsa.net\/","name":"SIPSA Servicios de Inform\u00e1tica Profesional","description":"Calidad Software en la Transformaci\u00f3n Digital","publisher":{"@id":"https:\/\/www.sipsa.net\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.sipsa.net\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.sipsa.net\/#organization","name":"SIPSA","url":"https:\/\/www.sipsa.net\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sipsa.net\/#\/schema\/logo\/image\/","url":"https:\/\/www.sipsa.net\/wp-content\/uploads\/2018\/08\/Logo-SIPSA-Horizontal-POSITIVO.jpg","contentUrl":"https:\/\/www.sipsa.net\/wp-content\/uploads\/2018\/08\/Logo-SIPSA-Horizontal-POSITIVO.jpg","width":800,"height":250,"caption":"SIPSA"},"image":{"@id":"https:\/\/www.sipsa.net\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/twitter.com\/SIPSA_IT","https:\/\/www.linkedin.com\/company\/17918127\/","https:\/\/www.youtube.com\/channel\/UC58Ur4nhjXpHMwK0RwaawCA?view_as=subscriber"]},{"@type":"Person","@id":"https:\/\/www.sipsa.net\/#\/schema\/person\/a15cd2234040add6c317cd853ed05d3b","name":"SIPSA Servicios de Inform\u00e1tica Profesional","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sipsa.net\/#\/schema\/person\/image\/","url":"https:\/\/www.sipsa.net\/wp-content\/uploads\/2021\/02\/Logo-SIPSA-POSITIVO300ppp.jpg","contentUrl":"https:\/\/www.sipsa.net\/wp-content\/uploads\/2021\/02\/Logo-SIPSA-POSITIVO300ppp.jpg","caption":"SIPSA Servicios de Inform\u00e1tica Profesional"},"sameAs":["https:\/\/www.linkedin.com\/company\/17918127\/","https:\/\/twitter.com\/SIPSA_IT","https:\/\/www.youtube.com\/channel\/UC58Ur4nhjXpHMwK0RwaawCA?view_as=subscriber"],"url":"https:\/\/www.sipsa.net\/en\/author\/sipsa\/"}]}},"_links":{"self":[{"href":"https:\/\/www.sipsa.net\/en\/wp-json\/wp\/v2\/posts\/4066"}],"collection":[{"href":"https:\/\/www.sipsa.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sipsa.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sipsa.net\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sipsa.net\/en\/wp-json\/wp\/v2\/comments?post=4066"}],"version-history":[{"count":10,"href":"https:\/\/www.sipsa.net\/en\/wp-json\/wp\/v2\/posts\/4066\/revisions"}],"predecessor-version":[{"id":4069,"href":"https:\/\/www.sipsa.net\/en\/wp-json\/wp\/v2\/posts\/4066\/revisions\/4069"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sipsa.net\/en\/wp-json\/wp\/v2\/media\/4037"}],"wp:attachment":[{"href":"https:\/\/www.sipsa.net\/en\/wp-json\/wp\/v2\/media?parent=4066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sipsa.net\/en\/wp-json\/wp\/v2\/categories?post=4066"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sipsa.net\/en\/wp-json\/wp\/v2\/tags?post=4066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}